Belt conveyors are mainly used to transport items from one location to another. In the middle of the conveyor, it can prevent certain packaging machines (such as heat shrinking machines and packaging machines) from completing a series of operations. how to install?
First, before installing the belt conveyor, we need to install 4 sets of deflection devices before and after the belt frame, and install reverse rollers before and after the installation. After that, we will install the drive device.
(1) First, we should choose 10mm screws, first install the single-sided drive plate and install the drive roller.
(2) Install the driver board on the other side.
(3) The second method is to install the two end faces of the driving roller, the bearing seat and the bearing of the driving roller sprocket.
(4) Then install the motor base (8 8mm×15 screws are usually used here)
(5) During the installation of the belt conveyor, the screws should be tightened to ensure that the driving roller can run smoothly.
(6) Install the chain of the motor and belt motor
(7) The second method is to tighten the motor base bolts and chain at the same time.
(8) When installing the pull-down rod between the outrigger and the outrigger, the height of the outrigger must be adjusted to ensure the plane height of the conveyor to meet the customer's requirements, and then adjust the 1.5mm plate to be sealed.
(9) After finishing the above work, you must turn on the power to test the machine and adjust the belt to avoid deviation.
(10) When assembling the bearing, high-quality grease should be added.
The above is a brief introduction about the installation method of the belt conveyor. Hope the above content is helpful to everyone.